Product Description
Early Stripping Slab System
T-form is the modular formwork for concrete slabs.T-form offers a quick and efficient solution to slab construction, with interlocking panels allowing you to customise your forms to suit various slab shapes easily. lts modular design means you can assemble and disassemble these panels quickly, which saves time and labour.T-form also provides a safe working environment with features like handrails and guardrails incorporated into its design.
Item |
Model |
Dimention |
Area |
Unit weight (kg) |
Slab Panel |
TF1812 |
1800X1200mm |
2.16 |
44.000 |
TF1809 |
1800x900mm |
1.62 |
38.000 |
TF1806 |
1800x600mm |
1.08 |
30.000 |
TF1512 |
1500X1200mm |
1.8 |
40.600 |
TF1509 |
1500x900mm |
1.35 |
33.000 |
TF1506 |
1500x600mm |
0.9 |
25.000 |
TF1212 |
1200x1200mm |
1.44 |
32.000 |
TF1209 |
1200x900mm |
1.08 |
26.000 |
TF1206 |
1200x600mm |
0.72 |
22.000 |
TF0909 |
900x900mm |
0.81 |
22.000 |
TF0906 |
900x600mm |
0.54 |
18.000 |
TF0606 |
600x600mm |
0.36 |
13.500 |
T-form for Slab concrete
T-form is for horizontal floor concrete.With many sizes,the biggest size is 1800X1200 mm, each panel with the early stripping mechanism,it can shorten the construction period and save your time.
The erection speed is as high as 60-100 square meters per person per day.
Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.3-4 workers in a team can quickly and easily set up and remove the panels.
Characteristics
1.More Quickly
- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.
2.More Safety
- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly
3.More Simplicity
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories
4.Hand-held design
Largest size panel 1800 x 1200mm only 44kg.
5.Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.
6.Much less cran-time be needed
Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.
7.Standardized panel for various structure building
All formwork component can be reusable on different project.
Product Shows
Packing & Shipping
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Basket: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Our Servise
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Company Profile



FAQ
Q1:Are you trading company or manufacturer?
A:We are factory for 14 years.
Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.
Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q5:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3-5 days based on specific requirements of construction project.
Q6:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, please feel free to contact us!