Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (31)
  • Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
  • Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
  • Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
  • Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
  • Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
  • Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Find Similar Products
  • Overview
  • Our Advantages
  • Product show
  • Characteristics
  • Our Sevices
  • Company Profile
  • Customer Photos
  • Certifications
Overview

Basic Info.

Model NO.
Slab Formwork
Certification
ISO
Material
Steel
Type
Slab Formwork
Surface Treatmer
Painted
Steel Type
Q355b,Q235B
Colour
Blue,Red,Customized
Permitted Concrete Pressure
60kN Per Square Meter
Thickness of Plywood
12mm
Plywood Reusability
30 Times
Function
Strengthen
Warrenty
1 Year
Application
Hotel, Wall, Column, Core Tube, etc
Transport Package
Standard Package
Specification
Customized
Trademark
Lianggong
Origin
China
HS Code
7308400000
Production Capacity
5000 Square Meter/Per Month

Product Description

Slab Formwork

Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret

Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret

Slab Formwork

T-form is for horizontal floor concrete.With many sizes,the biggest size is 1800X1200 mm, each panel with the early stripping mechanism,it can shorten the construction period and save your time. 
The erection speed is as high as 60-100 square meters per person per day.
Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.3-4 workers in a team can quickly and easily set up and remove the panels.
Item  Model  Dimention  Area Unit weight(kg)
T-Form Panel TF1809 1800x900mm 1.62 38.00
TF1806 1800x600mm 1.09 30.00
TF1512 1500X1200mm 1.8 40.60
TF1509 1500X900mm 1.35 33.00
TF1506 1500X600mm 0.9 25.00
TF1212 1200x1200mm 1.44 32.00
TF1209 1200x900mm 1.08 26.00
TF1206 1200x600mm 0.72 22.00
TF0909 900x900mm 0.81 22.00
TF0906 900x600mm 0.54 18.00
TF0606 600x600mm 0.36 13.50
 
Our Advantages

Light Weight Modular Slab Steel Frame Formwork for Concrete Column Formwork Concrete Formwork Steel Formwork Shutter Panel with Plywood 
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret

Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret

Slab Formwork
Slab formwork consists of steel frame and plywood. After the system is assembled, a whole frame is formed, which has good stability and high bearing capacity. Several inpendent systems, such as wall formwork, slab formwork and support system, are integrated organically, which means all the formwork is assembled in one time, and so is concrete pouring.
Material Q23B  High Strengthen Structure Steel
Thickness of Plywood  12mm
Maximum Lateral Pressure  for Column  60 KN/meter
Maximum Lateral Pressure  for Wall   Designed to withstand high concrete pressures.
Maximum Lateral Pressure  for Wall   60 KN/meter.
Height   600-3000 mm
Width     500-1200 mm
 
Product show
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
 Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Characteristics

1.More Quickly:

- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.

2.More Safety:
- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly

3.More Simplicity:
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories

4.Hand-held design:
Largest size panel 1800 x 1200mm only 44kg.

5.Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.

6.Much less cran-time be needed
- Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.

7.Standardized panel for various structure building
- All formwork component can be reusable on different project.

Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret

 

Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret 
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
 
Our Sevices
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 
Company Profile
 
Lianggong Formwork Co., Ltd.is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China with its factories located in Jianhu Economic Development Zone of Yancheng City,Jiangsu Province.As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research,development,manufacturing,and labor service.
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
During the years of hardworking since 2010 by the whole company staff,Lianggong has successfully delivered and served a large number of projects at home and abroad,such as bridges tunnels,power stations,and industrial & civil constructions.Major products of Lianggong include H20 timber beam, wall and column formwork,single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform,shaft beam, table formwork, ring-lock scaffolding and stair tower,cantilever forming traveller and hydraulic tunnel lining trolley,etc
 
Utilizing its strong technical background and many engineering  experience,and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret

Customer Photos

Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Certifications

 

Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Early Stripping Head Steel Panel Slab Floor Formwork for Building Concret
Q1: Are you trading company or manufacturer ?
A: We are manufacturer.

Q2: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q3: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q4: What is your terms of payment ?
A: Payment<=1000USD,100% in advance. Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier