Customization: | Available |
---|---|
Certification: | ISO |
Material: | Steel |
Still deciding? Get samples of US$ 1500/Ton
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tunnel formwork is an efficient formwork system that can complete the pouring of walls and slabs in one operation, forming a cellular reinforced concrete structure. It combines construction speed, quality, accuracy, and economy, creating an efficient load - bearing structure suitable for projects with repetitive cellular construction, such as residential buildings, hotels, prisons, etc. Depending on the building scale, it can finish pouring one floor within one to two days. Buildings constructed with this system feature low costs, good earthquake resistance, few defects, and reduced labor costs for fine - construction work.
1 | High seismic resistance due to monolithic slab & walls construction |
2 | Monolithic structure reduces number of joints and improves water tightness |
3 | Reduce labor costs (greater requirement of tower crane) |
4 | Reduce mobilization costs on site |
5 | Reduced construction times (2-3 days slab casting cycle can be achieved) which is up to 3 times faster than conventional |
6 | Higher quality finishes - Fair faced finish concrete can be achieved |
Packing
Typically, the total net weight of a loaded container ranges from 22 to 25 tons, necessitating confirmation prior to loading. We tailor our packaging to suit different product needs:
Bundles | Timber beam, steel props, tie rod, etc. |
Pallet | Small parts will be put in bags and then on pallets. |
Wooden cases | It is available on customer's request. |
Bulk | Some irregular goods will be loaded in bulk in container. |
Shipping
Production | For full container, normally we need 20-30 days after receive customer's down payment. |
Transportation | It depends on the destination charge port. |
Negotiation is needed for special requirements. |
Certificates
Q1: Are you trading company or manufacturer ?