Pipe Gallery Trolley
Pipe gallery is a tunnel built underground in a city, integrating various engineeringpipe gallerys such as electric power,telecommunication, gas, heat and water supply and drainage system. There is special inspection port, lifting port and monitoring system, and planning, design, construction and management for the whole system have been consolidated and implemented. It is an important infrastructure and lifeline for a city's running and management. To suit the market need, our company has developed the TC-120 pipe gallery troley system. lt is a new model trolley which ergonomically integrates the formwork systemand trolley into a unity. The formwork can be installed and removed easily by adjusting the spindle strut of the troley, without disassembling the whole system, thus achieving a safe and quick construction rationale.
* The pipe gallery trolley system transmits all the loads generated by the concrete to the trolley gantry through the supportsystem. The structural principle is simple and the force is reasonable. it has the characteristics of large rigidity, convenientoperation and high safety factor.
* The pipe gallery trolley system has a large operating space, which is convenient for workers to operate and relatedpersonnel to visit and inspect.
* Quick and easy to install, fewer parts required, not easy to lose, easy to clean on site.
* After one-time assembly of the trolley system, there is no need to disassemble and it can be put into recyclable use.
* The formwork of pipe gallery trolley system has the advantages of short erection time (according to the specific situation ofthe site, the regular time is about half a day), less personnel, and long-term turover can reduce the construction period andcost of manpower as well.
Packing:
1.Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2.Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
General introduction
Certification
Customer Photos
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
If you have any question,please feel free to contact us!