China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (31)
  • China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete
  • China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete
  • China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete
  • China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete
  • China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete
  • China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete
Find Similar Products
  • Overview
  • Product Description
  • Characteristics
  • Packaging & Shipping
  • Product show
  • Our service
  • Company Profile
  • Customer photos
  • FAQ
Overview

Basic Info.

Model NO.
Tunnel Formwork
Certification
ISO, CE
Material
Steel
Type
Tunnel Formwork
Model No.
Tunnel Formwork
Certificate
ISO9001
Size
Customized
Surface
Painted
Transport Package
Standard Package
Trademark
Lianggong
Origin
Jiangsu, China
HS Code
7308400000

Product Description

Product Description

Tunnel Formwork System 
Tunnel formwork  system is a system of steel formworks which avails simultaneous casting of concrete walls and slab of a building. The formwork surfaces that face the concrete are sheet-iron and provides a smooth surface concrete. Additional plasterind is not required. Tunnel formwork system is a system which provides; approximately 500 castings depending on utilisation conditions, cost effi ciency, maximized labor safety by use of scaffolding systems and casting of concrete every single day.
Tunnel form system is used in the production of buildings like housing, jail houses, and student hostels which have monolitic structure. Depending on the size of the structure, tunnel formwork system provides casting of a fl oor in 2 days or in a single day. The buildings which produced by tunnel formwork system are cost efficient, resistant to earthquake, have minimal level of production fl aws and have reduced fi ne-structure labor costs. Tunnel formwork system is preferred for buildings aswell.

China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for ConcreteChina Lianggong Manufacturer High-Strength Steel Tunnel Formwork for ConcreteChina Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete

Characteristics

Building
The formwork is specially adapted for each project. The repetitive nature of the system and the use of prefabricated forms and reinforcing mats/cages simplifies the whole construction process, producing a smooth and fast operation. The techniques used are already familiar to the industry, but with tunnel form construction there is less reliance on skilled labour.
Quality
Quality is enhanced despite the speed of construction. The precise, even steel face of the formwork creates a smooth, high quality finish capable of receiving direct decoration with the minimum of preparation (a skim coat may be required). This reduces the requirement for following trades, thus providing additional cost savings and speeding the entire process.
Design
The large bays constructed using tunnel form provide exceptional flexibility in the design and layout of the building and allow a high degree of freedom in the final appearance.
Safety
Tunnel form has integral working platforms and edge protection systems. In addition, the repetitive, predictable nature of the tasks involved encourages familiarity with operations, and, once training is complete, productivity improves as construction progresses. The minimal requirement for tools and equipment when moving the tunnel form further reduces the risk of accidents on site.
Sustainability
The insitu casting of units on site and the local availability of ready-mixed concrete supplies reduce transportation impacts.
Just-in-time deliveries and near zero wastage produce an overall tidier site with associated cost savings and safety benefits.

Packaging & Shipping

Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.


Delivery:

1 Production: For full container, normally we need 20-30 days after receive customer's down payment.
2 Transportation: It depends on the destination charge port.
3 Negotiation is needed for special requirements.
 

Product show

China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete
China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete
China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete
China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete

 

Our service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

 

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

 

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
 

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Company Profile

About us
Jiangsu Lianggong Formwork Co., Ltd is a pioneer manufacturer mainly engaged in the production and sales of formwork system & scaffolding. Thanks to 11 years of factory experience, Lianggong has won high praise from customers both at home and abroad for product quality and after-sales service.
Till now, we have cooperated with lots of top formwork companies and construction companies, such as DOKA, PERl etc. Our advanced production equipment and proficient front-line employees will guarantee you products with better quality and less time. Besides, Lianggong has professional technicians working together with sales department to ensure our customers' requirements are fully achieved. We offer one-stop service, you can choose products either off-the-shelf or customized.
What's more, our products have strict quality control from the procurement of raw materials to the sale of finished products which have been used in many projects such as industrial civil engineering works, roads and bridges, hydroelectric dam and nuclear power station. We can accept O E M and O D M. Feel free to contact us if you have any interest!
China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete

China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for ConcreteChina Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete

Customer photos

 

China Lianggong Manufacturer High-Strength Steel Tunnel Formwork for ConcreteChina Lianggong Manufacturer High-Strength Steel Tunnel Formwork for ConcreteChina Lianggong Manufacturer High-Strength Steel Tunnel Formwork for Concrete

FAQ

Q: Are you trading company or manufacturer?
A: We are factory.


Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.


Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.


Q: What is your terms of payment?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.

    
Any question, please feel free to contact us!

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier