Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (31)
  • Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction
  • Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction
  • Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction
  • Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction
  • Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction
  • Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Characteristics
  • Packaging & Shipping
  • Our Service
  • Company Profile
  • Certifications
  • Customer Photoes
Overview

Basic Info.

Model NO.
Climbing Formwork
Certification
ISO, CE
Material
Steel Wood
Type
Climbing Formwork
Color
Red,Blue, or Customized
Advantage
Easy Operation Quick Climbing and High Safety
Height of Climbing
3-4meters
Height of Bracket
10-15 Meters
Application
Hotel, High Rise Buildings
Certificate
ISO 9001:2008
Transport Package
Standard Package
Specification
No Standard
Trademark
Lianggong
Origin
Jiangsu, China
HS Code
7308400000
Production Capacity
400sets/Month

Product Description

Product Description

Cantilever Climbing Formwork

          The cantilever climbing formwork CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork. It is featured by its simple and quick operation, wide range adjustment for one-off casting height, smooth concrete surface, and economy and durability.The cantilever climbing formwork CB-240 has lifting units in two types: diagonal brace type and truss type. Truss type is more suitable for the cases with heavier construction load, higher formwork erection and smaller scope of inclination.The main difference between CB-180 and CB-240 is the main brackets. The width of main platform of these two systems is 180 cm and 240 cm respectively.  

Detailed Photos

Lianggong Customized Steel Cantilever Climbing Formwork for Concrete ConstructionLianggong Customized Steel Cantilever Climbing Formwork for Concrete ConstructionLianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction

Characteristics
High bearing capacity The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.
Simple moving procedure by crane Through the strong connection of formwork together with the climbing scaffolding,both can be moved as a single climbing unit by crane.Thus valuable time-savin gs can be achieved.
Fast striking process without a crane With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.
Safe with work platform The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.
Packaging & Shipping

Packaging:
1. To ensure optimal transport efficiency, the net weight of a fully loaded container generally ranges from 22 tons to 25 tons, requiring confirmation before the loading process commences.
2. Tailored packaging solutions are crafted for different product types to ensure safety and convenience:
---Bundles: Used for efficiently securing timber beams, steel props, tie rods, and similar products.
---Pallet: Designed for small parts, which are carefully bagged and then strategically positioned on sturdy pallets for secure transport.
---Wooden cases: Upon customer request, custom wooden cases are available to offer added protection and peace of mind.
---Bulk: Some uniquely shaped goods are expertly loaded in bulk within the container to maximize space and ensure stability during transit.


Delivery:

1 Production: For a full container, normally we need 20-30 days after receiving the customer's down payment.
2 Transportation: It depends on the destination charge port.
3 Negotiation is needed for special requirements.

Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction
Our Service
1. Consulting, Design, and Quotation
Explore our comprehensive offerings in formwork and scaffold solutions tailored to your project needs. LiangGong's diverse systems are at your disposal for optimal performance. We provide bespoke design and shoring proposals crafted meticulously using Auto-CAD, aligning perfectly with your structural requirements.
2. Manufacture and Quality Inspection
Benefit from our expansive production facilities and state-of-the-art production lines, backed by an expert quality inspection team, guaranteeing products of the highest standards. Our test reports adhere to varied regional norms, ensuring you face no compliance issues and meet all destination authority criteria seamlessly.
3. Packing and Shipment
From the precision of fabrication to seamless loading, our standard export packages ensure your products arrive efficiently at your site, eliminating any delays.
4. Remote or On-site Instruction
Our dedicated support provides you with remote or on-site guidance, addressing any queries with ease. We strive to ensure that your experience is smooth and your satisfaction is paramount throughout the entire journey.
Company Profile

Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction

Certifications

Lianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction

Customer Photoes

Lianggong Customized Steel Cantilever Climbing Formwork for Concrete ConstructionLianggong Customized Steel Cantilever Climbing Formwork for Concrete ConstructionLianggong Customized Steel Cantilever Climbing Formwork for Concrete ConstructionLianggong Customized Steel Cantilever Climbing Formwork for Concrete Construction

Frequently Asked Questions (FAQ)

Q1: Are you a trading company or a manufacturer?
A: We are a dedicated manufacturing factory.

Q2: What services do you offer?
A: We specialize in the innovative design and robust manufacturing of formwork and scaffolding solutions. These are pivotal in the construction of concrete structures across a variety of projects, including residential properties, multi-level complexes, towering skyscrapers, elegant towers, expansive sports stadiums, intricate bridges, hydropower units, and diverse industrial structures.

Q3: How can we assist you?
A: We provide expert advice, meticulous formwork layout plans, and comprehensive cost estimations to stakeholders such as project owners, architectural design institutes, and construction contractors.
B: Our products are available for purchase by contractors, construction companies, material suppliers, and trading entities.
C: We extend support to our global partners with our high-quality formwork and scaffolding products.
D: We offer both remote and on-site guidance to construction teams to ensure flawless execution.


Q4: Can you provide samples? Are they complimentary?
A: Absolutely, we offer complimentary samples; however, the cost of freight is not included.

Q5: What information is required to draft a preliminary design and quotation for a construction project?
A: We need the structural and sectional drawings.

Q6: How long does it generally take to formulate a brief design and quotation once we provide the structural drawings?
A: Typically, it requires about 5 to 7 days, contingent upon the specific needs of the construction project.

Q7: What is the estimated timeframe for manufacturing the products after the contract is signed?
A: Generally, the production period ranges from 30 to 60 days, depending on the type and volume of products ordered.

Q8: Could you explain your payment terms?
A: For payments up to 1000 USD, full payment is required in advance. For payments exceeding 1000 USD, a 30% T/T deposit is necessary, with the remaining balance due before shipment.

Should you have any inquiries, please do not hesitate to reach out to us!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier