Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Packaging:
1. Generally,the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products.
---Bundles:Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: lt is available on customer's reguest.
---Basket: Some irregular goods will be loaded in basket in container.
Steel Basket Steel Pallet
Shipping:
1.Production: For full container, normally we need 20-30 days after receive customer's down payment.
2.Transportation:It depends on the destination charge port.
3.Negotiation is needed for special requirements.
Q: Are you trading company or manufacturer? |
A: We are manufacturer. |
Q: What do you do? |
A: We design and manufacture formwork and scafolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise building,towers,sports stadium,bridges,industrial structures etc. |
Q: Do you provide samples? Is it free or extra? |
A: Yes, we could offer the sample for free charge but do not pay the cost of freight. |
Q: What can you do for us? |
A. We ofer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects. B. We sell our products to the contractors, building companies, material supplier or trading companies. C. We support our worldwide peer companies with our outstanding formwork or scaffolding products. D. We provide remote or on-site instruction to the builders. |
Q: What do you need in order to make a brief design and quotation when we have a construction project to be built? |
A: Structural drawing and section drawing. |
Q: How long does it take to make a brief design and quotation after we offer the structural drawing? |
A: In general, it takes 5~7 days based on specifc requirements of construction project. |
Q: How long dose it take to manufacture the products after the signing of contract? |
A: In general, it takes 30~60 days based on the type and quantity of products to be produced. |
Q: What is your terms of payment ? |
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment. |
If you have another question, please feel free to contact us !