Lianggong Manufacturer Hydraulic Auto-Climbing Formwork for Skyscrapers and Bridge Projects
Product Description
The power of hydraulic climbing formwork comes from the hydraulic jacking system which contains a hydraulic oil
cylinder and a vertical reversing box that can control the lifting rail or the lifting rack. The hydraulic system can
generate inter-climbing between the formwork rack and the rail so that the hydraulic climbing formwork can climb up
stably. During construction, the hydraulic climbing formwork doesn't need other lifting devices and has the
advantages of easy operation, quick climbing, and a high safety coefficient. It is the first choice for high-rise building
construction.
The hydraulic auto-climbing formwork system (ACS) is a wall-attached self-climbing formwork system, which is
powered by its own hydraulic lifting system. The formwork system (ACS) includes a hydraulic cylinder, and an upper
and lower commutator, which can switch the lifting power on the main bracket or climbing rail. With the power of the
hydraulic system, the main bracket and climbing rail are able to climb respectively. Therefore, the complete
hydraulic auto-climbing system (ACS) climbs steadily without a crane. No other lifting device is needed when using
the hydraulic auto-climbing formwork, which has the advantages of being easy to operate, fast, and safe in the
climbing process. ACS is the first-choice formwork system for high-rise tower and bridge construction.

Our Advantages
1. Hydraulic auto-climbing formwork can climb as a complete set or individually. The climbing process is steady,
synchronous, and safe.
2. The brackets of the auto-climbing formwork system will not be dismantled until the construction period is finished,
thus saving space for the site and avoiding damage to the formwork, especially to the panel.
3.It provides all-round operating platforms. The contractors do not need to set up other operating platforms, thus
saving the cost of material and labor, and improving safety.
4. The error of structure construction is small. As work on correction is simple, the construction error can be
eliminated floor by floor.
5. The climbing speed of the formwork system is fast. It can speed up the whole construction work (average 5 days
for one floor).
6. The formwork can climb by itself and cleaning work can be done in situ so that the use of a tower crane will be
greatly reduced.

Detailed Photos
Hydraulic system
The hydraulic system consists of the commutator, hydraulic system, and power distribution device. The upper and
lower commutator are important components for the force transmission between the bracket and the climbing rail.
Changing the direction of the commutator can realize the respective climbing of the bracket and climbing rail.


Packaging & Shipping
1. Generally, the total net weight of loaded container is 22 tons to 25 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Our Service
1.Consulting, Design, and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and first-class production line, as well as a professional quality inspection team,
which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients
or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease
and satisfied throughout the process.
Certifications


Company Profile
Yancheng Lianggong Formwork Co.,Ltd, founded in 2010, is a pioneer manufacturer mainly engaged in the
production and sales of formwork & scaffolding. Our company's main products include Hydraulic Climbing
Formwork, Cantilever Climbing Formwork, H20 Timber Beam Formwork System, Single-Sided Formwork, Protection
Screen and Loading Platform, Table Formwork, Trench Box, Plastic Formwork and etc.



Customers Visit



FAQ
Q: Are you trading company or manufacturer ?
A: We are manufacturer for formwork for years. Our main products: steel formwork, steel frame formwork, aluminum
frame formwork, wooden formwork, climbing formwork, tunnel formwork , bridge formwork, Culvert formwork etc.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to
quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What can you do for us?
A: We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or
contractors of the construction projects.
B: We sell our products to the contractors, building companies, material supplier or trading companies.
C: We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D: We provide remote or on-site instruction to the builders.
Q: Why should you buy from us not from other suppliers?
1. Professional team ; 12 years market experience.
2. Big factory for long term business relationship, 300000 tons capacity / year
3. One-stop service center for all formwork needs.
4. 24 hours on line service
Q: What is your terms of payment ?
A: Payment<=5000USD,100% in advance. Payment>=5000USD,50% T/T in advance,balance before shippment.
Q. What services can we provide?
Accepted OEM/ODM
Accepted Delivery Terms: FOB, CFR,CIF, EXW, FCA, DDP, Express Delivery;
Accepted Payment Currency: USD, EUR, CNY;
Accepted Payment Type: T/T, L/C, MoneyGram, Credit Card, Western Union, Cash, Escrow...
Language Spoken: English, Spanish, Portuguese, etc.
If you have another question, please feel free to contact us !