Lianggong H20 Timber Beam Formwork System

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (31)
  • Lianggong H20 Timber Beam Formwork System
  • Lianggong H20 Timber Beam Formwork System
  • Lianggong H20 Timber Beam Formwork System
  • Lianggong H20 Timber Beam Formwork System
  • Lianggong H20 Timber Beam Formwork System
  • Lianggong H20 Timber Beam Formwork System
Find Similar Products
  • Overview
  • Detailed Photos
  • Product show
  • Packaging & Shipping
  • Our Service
  • Certifications
  • Company Profile
  • Customer Photoes
Overview

Basic Info.

Model NO.
Slab Formwork
Certification
ISO
Material
Timber
Type
Wall Formwork
Size
Customized
Colour
Yellow,Customized
Feature
Flexible,Cuttable
Thickness of Plywood
15mm,18mm
Timber Beam Weight
5.2kg/M
Bearing Capacity
5-15kN/Square Meter
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution
Length
900-7000mm
Usage
Warehouse, Villa, Dormitories, Temporary Offices,
Auxiliary Equipment
Lifting Fork, Shifting Trolley
Surface
Yellow Waterproof Paint
Average Weight
4.8-5.2kg/M
Shuttering
Film Faced Plywood 1220*2440*18mm
Transport Package
Standard Package
Specification
Customized
Trademark
Lianggong
Origin
China
HS Code
8480600000
Production Capacity
3000 Meters/Day

Product Description

H20 Timber Beam

Lianggong H20 Timber Beam Formwork System
Lianggong H20 Timber Beam Formwork System
H20 Timber Beam
 H20 Timber beam is made of solid wood sawn timber as the flange and web (or multi-layer board as the web), bonded with weather-resistant adhesive, and the surface is painted with anti-corrosion and waterproof paint-a kind of lightweight structure component; 

Standard holes can be punched on both ends of the wood beam. During construction, the wooden beam can be lengthed as per need. we can also customize wooden beams into any length for your need.
The wooden beams is an important part of the wooden formwork system and is widely used in engineering.

 Widely  applied  in:  slab  formwork  system,  wall formwork  system, timber structures,  and other  temporary  bearinq structures.

 
Detailed Photos
Lianggong H20 Timber Beam Formwork System
Lianggong H20 Timber Beam Formwork System
 
Lianggong H20 Timber Beam Formwork System
Lianggong H20 Timber Beam Formwork System
 

Specifications of H20 timber beams:
Lianggong H20 Timber Beam Formwork System

 Timber beam lengthening
Lianggong H20 Timber Beam Formwork System

Timber beam end protection
Lianggong H20 Timber Beam Formwork System
Product show
Lianggong H20 Timber Beam Formwork System
Lianggong H20 Timber Beam Formwork System
Lianggong H20 Timber Beam Formwork System
Lianggong H20 Timber Beam Formwork System

 

Packaging & Shipping

Packaging:
1. Generally,the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products.
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: lt is available on customer's reguest.
---Basket: Some irregular goods will be loaded in basket in container.

 

Lianggong H20 Timber Beam Formwork System
Lianggong H20 Timber Beam Formwork System

 

Lianggong H20 Timber Beam Formwork System
Lianggong H20 Timber Beam Formwork System

 
                                        Steel Basket                                                                                  Steel Pallet

Shipping:
1.Production: For full container, normally we need 20-30 days after receive customer's down payment.
2.Transportation: It depends on the destination charge port.
3.Negotiation is needed for special requirements.

Lianggong H20 Timber Beam Formwork System
 
Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among Lianggong various systems,to fit your project demand.Design and Customizedforming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production ine, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to diferent norms from diferent regions in order to offer no wories to clients or meet destinaion authority requirements.

3.Packing and Shipment
From fabrication to loading,use standard export packages to get to your site quickly.

4.Remote or on-site instruction
If you have any questions, we can provide remote or on-site guidance.Our aim is to make customers feel at ease and satisfied throughout the process.

 
Certifications

Lianggong H20 Timber Beam Formwork System

 
Company Profile
Lianggong Formwork Co., Ltd.is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China with its factories located in Jianhu Economic Development Zone of Yancheng City,Jiangsu Province.As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research,development,manufacturing,and labor service.
Lianggong H20 Timber Beam Formwork System
Lianggong H20 Timber Beam Formwork System
During the years of hardworking since 2010 by the whole company staff,Lianggong has successfully delivered and served a large number of projects at home and abroad,such as bridges tunnels,power stations,and industrial & civil constructions.Major products of Lianggong include H20 timber beam, wall and column formwork,single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform,shaft beam, table formwork, ring-lock scaffolding and stair tower,cantilever forming traveller and hydraulic tunnel lining trolley,etc.
Utilizing its strong technical background and many engineering  experience,and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
Lianggong H20 Timber Beam Formwork System

Lianggong H20 Timber Beam Formwork System

 
Customer Photoes

Lianggong H20 Timber Beam Formwork System



Lianggong H20 Timber Beam Formwork System
Q: Are you trading company or manufacturer?
A: We are manufacturer.
 
Q: What do you do?
A: We design and manufacture formwork and scafolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise building,towers,sports stadium,bridges,industrial structures etc.
 
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 
Q: What can you do for us?
A. We ofer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B. We sell our products to the contractors, building companies, material supplier or trading companies.
C. We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D. We provide remote or on-site instruction to the builders.
 
Q: What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
 
Q: How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specifc requirements of construction project.
 
Q: How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
 
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, please feel free to contact us !

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier