China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building

Product Details
Customization: Available
After-sales Service: Online Technical Support,Onsite Installation
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (31)
  • China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
  • China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
  • China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
  • China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
  • China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
  • China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packing & Delivery
  • Our Service
  • Company Profile
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Wall and Column Formwork
Certification
ISO
Material
Steel Waler &H20 Timber Beam
Type
Wall Formwork
Application
Wall Column Slab Bridge Construction
Color
Yellow,Blue, Customized
Unit Weight
60kg/Sqm
Height
According to The Client′s Project
Usage
Adjustable
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
Jiangsu, China
HS Code
8480600000
Production Capacity
2000 Square Meter/Per Month

Product Description

 

Product Description


H20 Timber Beam Formwork

Wall Formwork
Timber beam straight wall formwork is mainly used for casting walls.The use of formworks speeds up construction greatly,shortens work period,reduces construction cost,and facilitates construction and quality control.
The straight wall formwork mainly consists of the formwork and the diagonal strut.The formwork is an integrated system of panel,wooden beam and steel back bridge;the diagonal strut can be designed according to need,or company standard diagonal strut can be adopted. At the corner,it is generally connected with the tie bar through the cast diagonal seat.
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building

Column Formwork
The timber beam column formwork is mainly used for casting the column body.It has structure the same as and connection similar to the straight wall formwork.
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building

Slab formwork
Timber beam formwork for slab offers advantages such as structural stability, ease of construction, and low material cost. On-site, it is easy to process and adjust, with strong adaptability, which improves construction efficiency and shortens project duration, especially for large-scale projects.
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building

Detailed Photos

China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
 
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building


 

Packing & Delivery

 
1.Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2.Different packages are used for different products: 
---bundles: Timber beam, steel props, tie rod, etc. 
---pallet: Small parts will be put in bags and then on pallets. 
---wooden cases: It is available on customer's request. 
---bulk: Some irregular goods will be loaded in bulk in container.
 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building

Our Service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process
 

Company Profile

China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building

China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building

Customer Photos

China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building
China Manufacturer Climbing CB240 & CB180 Shear Wall Formwork for High Rise Building

FAQ

Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
 A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
 A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

        If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier