Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: 1 Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (31)
  • Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
  • Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
  • Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
  • Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
  • Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
  • Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Find Similar Products
  • Overview
  • Detailed Photos
  • Structure Reference
  • Characteristics
  • Packaging & Shipping
  • Our Sevices
  • Company Profile
  • Customer Photos
  • Certifications
Overview

Basic Info.

Model NO.
Tunnel Formwork
Certification
ISO
Material
Steel
Type
Tunnel Formwork
Model No.
Steel Formwork
Useage
Concret Pouring
Application
Housing, Jail House, and Student House
Colour
Blue, Red, or Customized
Permitted Concrete Pressure
60000 Ton/Year
Thickness
Customized
Welding
CO2 Arc Welding
Warrenty
1 Year
Advantage
Quick Assemble
Transport Package
Standard Package
Specification
Customized
Trademark
Lianggong
Origin
China
HS Code
7308400000
Production Capacity
15000 Square Meters/Month

Product Description

Steel Tunnel Formwork

Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction

Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction

 

Model NO. Steel formwork
Type Tunnel Formwork
Technical Suppor Remote or on-Site Instruction
Advantage Quick Assemble
Specification Customized
Surface Treatment High Protected Painted, Power Coated, as Required
Specification Steel Q235
Production Capacity 60000 Ton/Year

Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction

Tunnel Formwork

Tunnel formwork is a kind of combined type formwork, which combines the formwork of cast-in-place wall and the formwork of cast-in-place floor on the basis of the construction of large formwork, so as to support the formwork once, tie the steel bar once, and pour the wall and formwork into shape once at the same time. Because of the extra shape of this formwork is like a rectangular tunnel, it is called tunnel formwork.

Tunnel formwork is a system of formwork that can be used during a normal cycle to cast the walls and formwork of a program. This system produces effective load-bearing structures that are widely used. The tunnel formwork space spans 2.4-2.6 meters, making it easier to subdivide and build smaller spaces.

Tunnel formwork system is used in the production of buildings like housing, jail houses, and student hostels which have monolitic structure. Depending on the size of the structure, tunnel formwork system provides casting of a fl oor in 2 days or in a single day. The buildings which produced by tunnel formwork system are cost efficient, resistant to earthquake, have minimal level of production fl aws and have reduced fi ne-structure labor

costs. 

Detailed Photos
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Structure Reference
 
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Characteristics
Building The formwork is specially adapted for each project. The repetitive nature of the system and the use of prefabricated forms and reinforcing mats/cages simplifies the whole construction process, producing a smooth and fast operation. The techniques used are already familiar to the industry, but with tunnel form construction there is less reliance on skilled labour.
Quality Quality is enhanced despite the speed of construction. The precise, even steel face of the formwork creates a smooth, high quality finish capable of receiving direct decoration with the minimum of preparation (a skim coat may be required). This reduces the requirement for following trades, thus providing additional cost savings and speeding the entire process.
Design The large bays constructed using tunnel form provide exceptional flexibility in the design and layout of the building and allow a high degree of freedom in the final appearance.
Safety Tunnel form has integral working platforms and edge protection systems. In addition, the repetitive, predictable nature of the tasks involved encourages familiarity with operations, and, once training is complete, productivity improves as construction progresses. The minimal requirement for tools and equipment when moving the tunnel form further reduces the risk of accidents on site.
Sustainability The insitu casting of units on site and the local availability of ready-mixed concrete supplies reduce transportation impacts.
Just-in-time deliveries and near zero wastage produce an overall tidier site with associated cost savings and safety benefits.
Packaging & Shipping
Package Size 250.00cm * 260.00cm * 30.00cm
Package Gross Weight 1000.000kg
 Packaging:
1. Generally,the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products.
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: lt is available on customer's reguest.
---Basket: Some irregular goods will be loaded in basket in container.
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction

Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Our Sevices
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Company Profile
Lianggong Formwork Co., Ltd.is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China with its factories located in Jianhu Economic Development Zone of Yancheng City,Jiangsu Province.As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research,development,manufacturing,and labor service.
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
During the years of hardworking since 2010 by the whole company staff,Lianggong has successfully delivered and served a large number of projects at home and abroad,such as bridges tunnels,power stations,and industrial & civil constructions.Major products of Lianggong include H20 timber beam, wall and column formwork,single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform,shaft beam, table formwork, ring-lock scaffolding and stair tower,cantilever forming traveller and hydraulic tunnel lining trolley,etc.
Utilizing its strong technical background and many engineering  experience,and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Customer Photos

Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Certifications

Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Flexible Working Platforms Steel Concrete Tunnel Formwork for Luxury Apartments Building Construction
Q1: Are you trading company or manufacturer ?
A: We are manufacturer.

Q2: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q3: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q4: What is your terms of payment ?
A: Payment<=1000USD,100% in advance. Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier