Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: 1 Year
Still deciding? Get samples of US$ 16/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (31)
  • Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
  • Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
  • Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
  • Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
  • Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
  • Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Find Similar Products
  • Overview
  • Detailed Photos
  • Product show
  • Product Parameters
  • Packaging & Shipping
  • Our Sevices
  • Company Profile
  • Customer Photos
  • Certifications
Overview

Basic Info.

Model NO.
Slab Formwork
Certification
ISO
Material
Steel
Type
Steel Prop
Model No.
Steel Push-Pull Prop
Application
Shoring and Platform Purpose
Advantages
Heavy Loads, Stable, Flexible, Easy Assembling
Color
Customized
Surface Finish
Paint, Powder Coated, Electro Galvanization, Hot D
Work Load Capacity
20kN & 30kN
Move Method
Building Scaffold
Eference Standard
En1065
Framework
Combined Scaffolding
Size
1500mm to 5000mm
Transport Package
Standard Package
Specification
Customized
Trademark
Lianggong
Origin
China
HS Code
7308400000
Production Capacity
10000 PCS/Day

Product Description

Steel Shoring

Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork

Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork

Steel Shoring

The steel prop is a support device widely used for supporting the vertical direction structurethat adapt to the vertical support of the slab formwork of any shape. It is simple and flexible and the installation is convenient, being economical and practical. The steel prop takes small space and is easy to store and transport.
Steel prop is adjustable within a specific range and can be adjusted as needed. There are mainly three types of steel props:
1.Outer tubeφ60,Inner tubeφ48(60/48)
2.Outer tubeφ75,Inner tubeφ60(75/60)
3.Outer tubeφ88.5,Inner tubeφ75.5(88.5/75.5)
Detailed Photos
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Product show
 
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Product Parameters
Specification Weight (Kg) Item No.
75/60  Series
Bearing capacity:30KN,
Galvanized.
250A (75/60)
Height:1400~2500
300A (75/60)
Height:1650~3000
350A (75/60)
Height:1900~3500
400A (75/60)
Height:2150~4000
14.64

16.53

19.93

25.32

 
03020100

03020200

03020300

03020400
550B (88.5/75.5),
Bearing capacity:20KN,
Galvanized.
Height:2900~5500
31.65 03020500
60/48  Series
Bearing capacity:20KN,
Galvanized.
250B (60/48)
Height:1400~2500
300B (60/48)
Height:1650~3000
350B (60/48)
Height:1900~3500
11.5

13.98

17.79
03020600

03020700

03020800

 
 
Packaging & Shipping
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Basket: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork

Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Our Sevices
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Company Profile
 
Lianggong Formwork Co., Ltd.is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China with its factories located in Jianhu Economic Development Zone of Yancheng City,Jiangsu Province.As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research,development,manufacturing,and labor service.
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
 
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
During the years of hardworking since 2010 by the whole company staff,Lianggong has successfully delivered and served a large number of projects at home and abroad,such as bridges tunnels,power stations,and industrial & civil constructions.Major products of Lianggong include H20 timber beam, wall and column formwork,single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform,shaft beam, table formwork, ring-lock scaffolding and stair tower,cantilever forming traveller and hydraulic tunnel lining trolley,etc.
 
Utilizing its strong technical background and many engineering  experience,and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Customer Photos

Building Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Certifications

Building Material Customized Adjustable Steel Prop for Concrete Construction FormworkBuilding Material Customized Adjustable Steel Prop for Concrete Construction Formwork
Q1: Are you trading company or manufacturer ?
A: We are manufacturer.

Q2: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q3: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q4: What is your terms of payment ?
A: Payment<=1000USD,100% in advance. Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier