Hydraulic Auto-Climbing System
Hydraulic Auto-Climbing System is attached to the wall of the self-climbing template, its power source is its own hydraulic jacking system, the hydraulic system includes hydraulic cylinders and up and down reversing box, reversing box can control the guide rail climbing and frame climbing, through the hydraulic system can make the template frame and the formation of the guide rail climbing each other, so as to make the hydraulic self-climbing mold climbing steadily upwards, the hydraulic self-climbing mold in the process of construction without other lifting equipment, easy to operate, climbing Fast speed, high safety factor. Can climb straight, can also climb diagonally is the first choice of high-rise building construction and bridge construction formwork system.
* Both straight and inclined climbing, fast climbing speed.
* Can climb as a whole or as a unit, and the climbing process is smooth, synchronized and safe.
* After assembled once, the climbing frame will not fall to the ground until the top (except the node), which saves
the construction site and reduces the damage of the template (especially the panel).
* Providing all-round operation platform, the construction unit doesn't need to waste materials and labor for
re-building the operation platform, which improves the safety.
* Small structural construction error, simple correction, construction error can be eliminated layer by layer.
* The formwork climbs by itself and cleans up in situ, which reduces the lifting time of the tower crane.
Diagonal Brace Type
Truss Type
Packing:
1.Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2.Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
General introduction
Certification
Customer Photos
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
If you have any question,please feel free to contact us!