Protection Screen
Protection Screen is a safety system in the construction of high-rise buildings. The system consists of rails and hydraulic lifting system and is able to climb by itself without crane. Protection screen has the entire pouring area enclosed, covering up three floors at the same time, which can more effectively avoid high air fall accidents and ensure the safety of the construction site. The system can be equipped with unloading platforms. After pouring the slab, the formwork and scaffolding can be transported to the unloading platform, and then lifted by tower crane to the upper level for next step working, so that it greatly saves manpower and material resources and improves the construction speed.
The protection screen is an advanced, state-of-the-art system which suits the demand for safety and civilization on site, and it indeed has been widely used in high-rise tower construction.
Further, the exterior armor plate of the protection screen is a good advertising board for publicity of the contractor.
Anchor system
The anchor and the anchor shoe are the main load bearing parts of the protection screen. The anchor shoe is fixed on the floor by tensile bolt.
Hydraulic and load bearing system
The power of the protection screen system comes from the hydraulic system, which lifts thw climbing rails up gradually, thus enabling the entire protection screen system to climb up 300mm every time. The picture below shows the powering part of the protection screen. Insert the load bearing pin whenthe rail climbs to the desired position.
The load-bearing device is installed in the middle of each rail as a movable load-bearing part.
Packing Details: Products are securely packed using boxes, steel pallets, steel racks or containers to ensure safe transportation.
Delivery Time: Usually, delivery takes 25-30 days, depending on the order quantity.
Shipping Port: All goods are shipped from Shanghai Port, ensuring efficient international delivery.
More Products
Exhibition News
Customer Visit
Technical Planning
Our technicians will recommend the best solution for your projects and be responsible for the design and revise of corresponding Auto-CAD drawings as per your structure diagrams and requirements, which can help your on-site construction teams to know how to assemble and operate our formwork & scaffolding systems. The design flow is as follows:
1. Our technicians will design the preliminary drawing and our sales agent will offer it to you along with the first quotation shortly after receiving your email which shall include your structural drawings.
2. Revise the preliminary drawing as per your requirements.
3. After confirmation of the final drawing, our sales agent will send you the final quotation.
4. It will also be our responsibility to offer you all the shopping drawings & assembly drawings before the products get to the destination.
Professional Team
Lianggong has a professional technical department working together with sales department to ensure our customers' requirements are fully achieved. We offer one-stop service, you can choose products either off-the-shelf or customized.
What's more, our company has established a quality management system that meets the requirements of the international quality management system. What's more, our company has established a quality management system that meets the requirements of the international quality management system. Our products have strict quality control from the procurement of raw materials to the sale of finished products which have been used in many projects such as industrial civil engineering works, roads and bridges, hydroelectric dam and nuclear power station.We can accept OEM and ODM.
Q1: Are you a factory or trading company?
We are a factory.
Q2: How to get a quaotation?
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q3: What is the payment term?
By T/T or L/C.
Q4: What is the lead time?
Generally, it takes 25-30 days according to the quantity.
Q5: What is the package method?
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Q6: Do you have any guarantee on the quality?
We guarantee the quality of different products. If necessary, you can arrange a third- party company to inspect the product quality in our factory.
Q7: Do you have on-site supervision service?
Yes, we have an on-site supervision service for most of our projects worldwide except for a new restriction regions.
Q8: What benefit can we get from LIANGGONG?
From LIANGGONG, you can get one stop service from design-manufacture-delivery-after sale service.
Q9: Are you looking for agent or distributor in our country?
Yes, we are looking for an agent or distributor worldwide base on a win-win relationship.
Q10: How to purchase your formwork and scaffolding?
For any order you proceed with, LIANGGONG will follow the following steps.
Step 1. Confirm the order based on our proposal after technical & commercial communication-by the customer, LIANGGONG overseas sales team and technical team.
Step 2. Make the deposit-by the customer.
Step 3. Report on production schedule weekly until completion-by LIANGGONG customer team.
Step 4. Execute pre-shipment inspection company.
Step 5. The balance payment-by the customer.
Step 6. Arrange the loading and shipment after balance payment-by LIANGGONG customer team.
Step 7. Submit the complete set of shipping documents via courier after departure- by LAINGGONG customer team. Step 8. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings-by LIANGGONG overseas sales team.
Step 9. Site supervision-by LIANGGONG on-site supervision team.