Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Product Details
Customization: Available
After-sales Service: Online Technical Support,Onsite Installation
Warranty: One Year
Still deciding? Get samples of US$ 189/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (31)
  • Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
  • Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
  • Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
  • Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
  • Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
  • Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
Find Similar Products

Basic Info.

Model NO.
Skydeck Slab Formwork
Certification
ISO
Material
Aluminum
Type
Slab Formwork
Max Supporting Weight
90kN
Color
Yellow
Supporting Thickness
Over 950 mm
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
Welding
Automatic Welding
Application
Building Construction
Transport Package
Standard Package
Specification
Standard
Trademark
LIANGGONG
Origin
Jiangsu, China
HS Code
7308400000
Production Capacity
3000 Square Meters/Per Year

Product Description

Product Description
 

Skydeck
 

Lianggong Skydeck is made of lightweight 6061-T6 aluminum alloy material as raw material, supplemented by advanced production technology to achieve the purpose of rapid lifting. In addition, the system is equipped with an early removal system, so that you can work on construction projects easily and safely, fast and cost saving. The system can be used repeatedly. In addition, the skydeck contains advanced design concepts, and the aluminum prop is equipped with a measuring scale for easy fine-tuning of the working process.
 
Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
 
Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
Lightweight aluminium support
 
It can be used in combination with countersunk heads and panels to form a complete system.
 
The lightweight aluminium supports not only facilitate easier handling and installation but are also safer and more durable.
 
On site, it can be rapidly installed and dismantled with minimal labour, which not only enhances efficiency but also reduces the need for other machines, making the site safe, tidy and orderly.

The SKYDECK system features adrophead.
 
The drophead principle enables striking after only 1 day, depending on the slab depth and concrete strength.
 
Striking is made easier as the panels can be more easily released from the concrete after a short time.
 
The possibility of striking after a short time permits work to be carried out more flexibly (e.g. during bad weather or when personnel have free capacity).
Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
 
Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
Forming with the SKYDECK droph-ead means fast concreting cycleswith small quantities of on-sitematerial requirements.
 
The drophead principle enables striking after only 1 day, depending on the slab depth and concrete strength.
 
Striking is made easier as the panels can be more easily released from the concrete after a short time.
 
The possibility of striking after a short time permits work to be carried out more flexibly (e.g. during bad weather or when personnel have free capacity).
 

Product Specifications
 
Paraments
Model Skydeck
Material Aluminium Alloy
Application Slab
Supporting Thickness Over 950 mm
Accessories Aluminium Prop

Product Shows

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Characteristics

1. Lightweight and robust, facilitating construction while ensuring safety.
2. Characterized by low weight and high strength, offering substantial load-bearing capacity.
3. Convenient for storage and transportation.
4. A wide range of template specifications enhances system versatility.
5. Versatile application suitable for diverse purposes.
6. Cost-effective with high efficiency, providing economic and practical benefits.
7. Extended service life with minimal loss.


Product Peremeters

1.Four-start start-thread cast steel nut

The cast steel nut with four-start start-thread can easily adjust the height of the inner column. One turn can raise it by 36 mm. The adjustment speed is twice as fast as that of a single thread, and the adjustment efficiency is three times that of ordinary steel pillars.

2.Automatic concrete removal function

The design of the inner column and nut realizes the function of spontaneous concrete removal when the pillar system rotates. Even in the case of extremely severe adherence of dirt, the nut can still move freely.

3.Height measurement scale

The inner column is marked with a height measurement scale to show quick pre-adjustment, reducing the labor cost spent on measurement and adjustment.

4.Safety stop device


The column also provides a safety stop device to prevent the inner column from accidentally sliding off when loosening

5.External column spray coating

The surface of the outer column is sprayed with plastic to effectively prevent concrete adhesion.

Props with Built-in taps and safe stopping device makes safe and fast operation.
- For slab thickness up to 100cm with 150cm main beam, and up to 40cm with 225cm main beam.
- Flexible solution with specially designed accessories for infill area around columns or edge of slab near walls.
- 750/500/375mm width by 1500/750mm length aluminium panels lined with Form birch,the biggest size panel 750*1500mm only weights 16.2kg.

Model LG120 LG250 LG350 LG480 LG625
Min.Length (mm) 800 1450 1980 2600 4300
Max.Length (mm) 1200 2500 3500 4800 6250
Weight (Kg) 10.4 15.5 18.7 23.8 30.2
Min~ Max Load (kN) 70~90 60~70 42~88 25~85 20~56

Aluminium Props range from 800mm to 625mm and have a maximum workload of up to 90kN.
 
Packaging&Shipping

Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Basket: Some irregular goods will be loaded in bulk in container.


Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

 

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Our Advantages

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection

 
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment

 
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction

 
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Company Profile

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction
Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Certificates
 
Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

Customer Photos

Lianggong High-Quality Pre-Assembled Steel and Aluminium Skydeck Slab Formwork System for Concrete Construction

FAQ

Q1:Are you trading company or manufacturer?
A:We are factory for 14 years.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.


Q5:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3-5 days based on specific requirements of construction project.

Q6:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


If you have another question, please feel free to contact us!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier