Customization: | Available |
---|---|
After-sales Service: | One-Stop Service |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
H20 Timber Beam
Timber beam end protection
The timber beams are an important part of the formwork system and are widely used in engineering projects.
To protect the timber beam from being damaged and extend the service life, we've designed the following four end caps for your choice.
Packaging:
1. Generally, the total net weight of a loaded container is 22 tons to 25 tons, which needs to be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available at customer's request.
---Bulk: Some irregular goods will be loaded in bulk in the container.
Delivery:
1 | Production: For a full container, normally we need 20-30 days after receiving the customer's down payment. |
2 | Transportation: It depends on the destination charge port. |
3 | Negotiation is needed for special requirements. |
Q1:Are you a trading company or manufacturer?
A: We are a factory.
Q2:What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structures in the fields of housing, multi-story structures, high-rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures, etc.
Q3:What can you do for us?
A: We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B: We sell our products to contractors, building companies, material suppliers, or trading companies.
C: We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D: We provide remote or on-site instruction to the builders.
Q4:Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample free of charge but do not pay the cost of freight.
Q5:What do you need to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of a construction project.
Q7:How long does it take to manufacture the products after the signing of the contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8:What are your terms of payment?
A: Payment<= 1000 USD, 100% in advance. Payment>= 1000 USD, 30% T/T in advance, balance before shipment.
Any questions, please feel free to contact us!