Alumiunm Platform
LIANGGONG aluminum formwork system is used globally for forming cast-in-place complete reinforced concrete structures to high quality standards and to achieve rapid construction cycles. Using our aluminum formwork system, all building components can be cast in a single operation: Wall, Column, Slab, Beam, Staircase, Balcony Door and window openings are also incorporated.
1. Short period of construction
The aluminum form work system is in the line of quick dismantling form system.lt is more cost efficient to save your management cost in that one layer(a set of wooden board and 3-6 sets of prop systems) can be completed in four working days so the construction works can be conducted in a swift manner, accelerating the site works.
2. Highly reuse rate, reducing the average cost
A complete set of the aluminium formwork system, whose original materials compressed as an intearated system, can be used repeatedly over 100 to 400 times, which makes the average cost very low.
3. Construction more easily, conveniently and effectively
The aluminium formwork system is easy to assemble with the average weight of 20-25 kg, which can be totally removed and assembled by hand. The simple design of it makes it easy for the workers to learn and speed up the work-flow; its average working rate per worker is 20-30 square meter.
4. Good stability,high load bearing capacity
Presently, most of the aluminium formworks have the loading capacity of 30KN/square meter, which is sufficient to meet the loading capacity
requirements of the branch formwork most of the residential buildings.
5. Wide range of application,higher value in recycle use
The aluminium formworks system is suitable for the wall, the horizontal floor slab, the post, the beam, thestaircase, the window and the floating plate, etc, ltis also useful in the secondary structures such as the bondbeams and tie columns. The waste of the aluminium formwork is also very high value.
6. Smoother surface of the concrete after removal
Less joints issues and hicher accuracy, There is no need to plaster of the concrete after the removal of the formwork.
7. Less waste left on the construction site
As it has higher rate in recveling,the aluminium building formwork isconvenient to remove with less waste,leaving a safe, clear and tidy workingsite.
8. Standardized, wide versatility, low carbon emission environmantal protectiom
The specifcation of the aluminum form work is multiple and can be assembled with different plates according to the construction projects. Only 20% of the non-standard plates of the formwork need to be replaced in asecond application. Low rate of the carbon emission. Most of the aluminium building materials belong to the renewable kinds which are in accordance with the regulations of the energy saving, the environmental protection and low carbon.
9. Supporting system more simple
Contrast to traditional formwork systems, aluminum formwork system use less supporting rods, it leaves more space for walking or materials transportation.
Package:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1 |
Production: For full container, normally we need 20-30 days after receive customer's down payment. |
2 |
Transportation: It depends on the destination charge port. |
3 |
Negotiation is needed for special requirements. |
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
About us
Jiangsu Lianggong Formwork Co., Ltd is a pioneer manufacturer mainly engaged in the production and sales of formwork system & scaffolding. Thanks to 11 years of factory experience, Lianggong has won high praise from customers both at home and abroad for product quality and after-sales service.
Till now, we have cooperated with lots of top formwork companies and construction companies, such as DOKA, PERl etc. Our advanced production equipment and proficient front-line employees will guarantee you products with better quality and less time. Besides, Lianggong has professional technicians working together with sales department to ensure our customers' requirements are fully achieved. We offer one-stop service, you can choose products either off-the-shelf or customized.
What's more, our products have strict quality control from the procurement of raw materials to the sale of finished products which have been used in many projects such as industrial civil engineering works, roads and bridges, hydroelectric dam and nuclear power station. We can accept O E M and O D M. Feel free to contact us if you have any interest!
Q: Are you trading company or manufacturer?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
Any question, please feel free to contact us!